News

­

Case Study – Renewable Power for Solar Hybrid Wellsites

INDUSTRY Oil and Gas CLIENT Origin YEAR 2018 POWER SIZING 8kW to 32kW FUEL TYPE Gas / Solar / Battery CHALLENGE CD Power was challenged to demonstrate the technical and commercial value of the hybrid solar battery generator package for operation on a coal seam gas (CSG) wellsite. This project combines three [...]

Case Study – Stand-by Power

INDUSTRY Aged Care CLIENT Anglicare YEAR 2018 POWER SIZING 230kVA FUEL TYPE Diesel CHALLENGE Anglicare required stand-by power generation for a number of residential care facilities across Adelaide, South Australia. SOLUTION The primary use of this Tide Power 230kVA diesel generator is for stand-by power generation for a residential care [...]

Case Study – HPU

INDUSTRY Drilling CUSTOMER Clisby CHALLENGE To design, build and deliver an HPU with lead time of less than one month, during the Christmas break, for shipment to North Africa. The appliance was required drive hydraulically powered drilling equipment reliably in year-round, high North African temperatures. SOLUTION CD Power took a [...]

Case Study – Cooper Basin

INDUSTRY Oil and Gas CUSTOMER A Tier 1 Oil and Gas Producer CHALLENGE Design and manufacture a faster, cheaper and more flexible self-bunded skid to replace traditional concrete bund. SOLUTION A range of electrically-driven Oil Well Beam Pumps in South Australia's Cooper Basin will be powered and controlled with an [...]

Case Study – NextGen

INDUSTRY Telecommunications CUSTOMER NextGen CHALLENGE The laying of the north-west cable system, including subsea fibre-optic cable between Darwin and Port Hedland, is a key infrastructure project for the off-shore oil and gas industry and provides much needed regional network competition (breaking the current Telstra monopoly). With the cable landing stations positioned in [...]